Early Projects
With Royal Commission

Royal Commission - Jubail - SWC2 115/4.16kV Substation Project

Complete installation, testing and commissioning of 115/4.16kV Substation. Testing & commissioning Line 1 & 2 from Jubail southeast to SWC2 [underground cable system], related control and protection systems comprising the following:

Two (2) each:

35/47 MVA 115/4.16kV Hyundai Make Transformer.

Two (2) each:

115kV manually operated disconnect switches with grounding switches.

Two (2) each:

Neutral grounding resistors.

Two (2) each:

Line relay panel set 1 & set 2 each.

One (1) each:

Breaker failure protection panel.

One (1) each:

Annunciator panel.

One (1) each:

Jungle Mux communication panel.

One (1) set:

SCADA, SOE, Fault recorder modifications.

Two (2) each:

Metering panel consisting of Quad 4, P. F. meter and energy meter.

Thirty one (31) each:

4.16kV 2.5/1.5 MVA Metal circuit breakers / MCC.

Eight (8) each:

Commissioning of 4.16kV 1.8 MVA motor MITSUBISHI - Make.

Eleven (11) each:

Testing & commissioning of 4.16/0.480 kV 2.5/1.5 MVA Distribution transformers (WESCOSA). 

One (1) Lot:

4.16kV Cable terminations and Hi-pot tester. 

Complete installation, supply, testing and commissioning of HVAC system (PackageUnit) at 230/34.5KV IBN BAYTAR main substation indoor / outdoor HVAC works.